Getting to know the client about his desires, dreams and ambitions. And of course also his budgets. At the same time getting to know the site, its advantages and disadvantages. Creating a design program that meets the customer's requirements and the site's conditions together.
01/01/2017At this stage, a preliminary design proposal will be presented showing the required changes in the existing plan based on the required program.
01/01/2018Presentation of a final plan for execution, after examining all the planned alternatives. showing the structure of the space with its furniture.
01/01/2019Preparation of a set of detailed work plans for execution, including details and final details. as required.
01/01/2020Selection of finishing materials such as: flooring materials, wall coverings and surfaces, doors and windows. Selection of sanitary ware and accessories for toilets and bathrooms. Permanent carpentry planning: kitchen, bedroom and bathroom cabinets.
01/01/2021Selection of mobile furniture and upholstery fabrics. Choosing lighting fixtures. Choosing design details such as: carpets, curtains, pictures, etc.
01/01/2022Visits to the site only at key points in the construction process, for the purpose of checking compatibility between the plans and their implementation in the field. In accordance with the permit in the field from the executing contractor, the delivery of the project by the designer and the contractor to the client at the end of execution.